MOREPEN LABORATORIES LIMITED

Manufacturing & quality

Chemistry at scale.
Infrastructure with purpose.

A 614 KL API and CDMO manufacturing platform, with the technical detail to support a focused qualification discussion.

Discuss manufacturing fit
Morepen Baddi campus

Manufacturing network

Two sites.
Clear capabilities.

Current plant capabilities are presented for technical orientation. Equipment availability, campaign fit and site suitability are assessed for each program.

Baddi485 KL

API / CDMO reactor capacity

P8, P9, P9A, P10, P10A, P11, P12

SRP capacity
63 KL
Distillation columns
10
Hydrogenation reaction volume
5.75 KL (4 KL + 1.5 KL + 0.25 KL; 3 nos.)
Cryogenic reaction volume
100 KL
Cryogenic temperature
-25 to -85 °C
Cleanroom areas, including powder processing
17
MSL129 KL

API / CDMO reactor capacity

Unit 1, Unit 2, Pilot Plant

SRP capacity
28 KL
Distillation columns
5
Hydrogenation reaction volume
0
Cryogenic reaction volume
40 KL
Cryogenic temperature
-30 to -80 °C
Cleanroom areas, including powder processing
5

Current installed figures are shown for technical orientation. MSL and SRP terminology should be expanded in the production website after engineering approval. Equipment scopes are different and should not be combined as reactor capacity.

Morepen process equipment

Scale-up is a connected discipline

Beyond reactor volume.

Process equipment, utilities, finishing areas, quality-control infrastructure and environmental systems support the manufacturing program.

Discuss equipment fit, process requirements, technical transfer and quality responsibilities before a campaign is committed.

Scale-up & technology transfer

The expansion roadmap

Current scale.
Future milestones.

Later milestones remain forward-looking, subject to customer programs, execution and regulatory readiness.

INSTALLED

614 KL

Installed / current brochure

ROADMAP

800 KL

Next milestone

ROADMAP

1000 KL

Subsequent milestone

ROADMAP

1200 KL

Longer-term roadmap

Roadmap: September 2026 AGM address. Future milestones are not commissioned or uncommitted capacity.

Quality & regulatory evidence

Confidence is built
in the details.

Inspection outcomes, certifications and awards have different meanings. The evidence and scope stay visible.

04

Consecutive NIL Form 483
inspections reported

MASULKHANA / 17 APRIL 2026

A dated, site-specific
quality milestone.

The latest disclosed inspection concluded without Form 483 observations.

Read the inspection disclosure
Quality & credentials

Responsible operations

Infrastructure for
business continuity.

Water treatment and reuse, solar initiatives, cleaner energy and responsible waste management support the operating platform.

Responsible manufacturing

Let's build your next program.

Start a conversation about your API, development or manufacturing requirements.

Talk to our team